風電基礎模板是按照對于大型風力發電基礎使用的鋼模板定制加工的,一般都是分為上下兩層,一套模板的重量在2噸左右,該模具在內蒙古、青海、山西、寧夏等得到了廣泛的應用,我們要保證風電基礎建設工程的安全性,就需要我們對它的安裝有一些了解。我們使用風電基礎模板生產出來的基礎底座里面需要對其進行固定,我們的對其的支撐框要固定埋設在水泥里面,保證水溝兩面的支撐面是平整堅固的,這樣電纜槽才能更加的穩固。風電基礎模板模具重要性是因為風力發電設施離不開它,按照高度和厚度就會有所不同,所以它的尺寸是多變的,只有定制打造,才能夠多方面滿足不同需要,更能讓客戶滿意。風電基礎模具可以成排組裝,批量澆灌后一次成型,有著無需運輸、效率更高、更加牢固的特點,被廣泛地應用在風力發電的工程建設上。
The wind power foundation formwork is customized and processed according to the steel formwork used for large-scale wind power generation foundation. It is generally divided into upper and lower layers. The weight of a set of formwork is about 2 tons. The formwork has been widely used in Inner Mongolia, Qinghai, Shanxi and Ningxia. To ensure the safety of wind power infrastructure construction project, we need to know something about its installation. The foundation base produced by using the wind power foundation template needs to be fixed. Our support frame should be fixed and buried in the cement to ensure that the support surfaces on both sides of the ditch are flat and firm, so that the cable trough can be more stable. The importance of wind power foundation formwork mould is that wind power generation facilities are inseparable from it, which will vary according to the height and thickness, so its size is changeable. Only by customization can it meet different needs in many aspects and satisfy customers. The wind power foundation mold can be assembled in rows and formed at one time after batch pouring. It has the characteristics of no transportation, higher efficiency and firmer. It is widely used in the engineering construction of wind power generation.
風電基礎模板結構比較復雜分成的塊數也比較多,所以在安裝風力發電基礎模具、風力發電基礎鋼模具時按照圖紙上的指示進行操作,風力發電基礎鋼模具在安裝的時候上都是使用吊車吊裝到具體的位置的,施工現場的環境是比較復雜的,在對安裝生產的過程中可能會出現的情況做出預判,并想出解決的辦法,在安裝前對整套的風力發電基礎模具進行系統的檢查,包括他的零部件,在吊裝風力發電基礎鋼模具的過程中為了保證放置的位置準確,一般都會在施工的場地做標記,然后將模具放到的施工附近的位置后,工人在將風力發電基礎鋼模具的具體位置進行調整,讓他生產的準確度大大提高,然后使用螺栓將各個模板對接拼接到一起,更好的保證工程生產質量,風力發電基礎鋼模具用完了之后是會有污漬殘留的,每次使用完后都要進行清理工作。
The wind power foundation formwork structure is complex and divided into a large number of blocks. Therefore, when installing the wind power foundation mould and wind power foundation steel mould, operate according to the instructions on the drawing. The wind power foundation steel mould is hoisted to the specific position by crane during installation, and the environment of the construction site is relatively complex, In the process of installation and production, make a pre judgment on the possible situations, and come up with solutions. Before installation, systematically inspect the whole set of wind power generation foundation mold, including its parts. In the process of hoisting wind power generation foundation steel mold, in order to ensure the accurate position, it is generally marked on the construction site, Then, after the mold is placed near the construction site, the worker adjusts the specific position of the wind power generation foundation steel mold to greatly improve the accuracy of his production, and then uses bolts to butt and splice each template together to better ensure the project production quality. After the wind power generation foundation steel mold is used up, there will be stains left, Clean up after each use.