塑料現澆模板生產出來的混凝土預制件的表面光滑、緊實、使用時間長久不需要經常更換就能使用很長的時間,能夠節省很多的生產成本,現澆塑料模板包括現澆水溝模板、現澆防撞墻模板,模板使用的是塑料材料生產的,所以生產出來的混凝土預制件比使用鋼板制作出來的混凝土預制件使用的時間長久很多,一定要合理的操作模板,F澆鋼模板的詳細描述會從模板的尺寸、外形、使用優勢等多方面進行詳細的描述,模板的體積不同,使用的鋼板厚度也不同,一般都會使用厚度5毫米左右的鋼板制作模板,模板的尺寸不是固定的,道路建設工程負責人可以根據自己的真實工程需求制作出符合自己工程標準的模板,然后再使用模板制作現澆防撞墻。
The surface of the concrete prefabricated parts produced by the plastic cast-in-situ formwork is smooth, compact and has a long service time. It can be used for a long time without frequent replacement, which can save a lot of production costs. The cast-in-situ plastic formwork includes the cast-in-situ ditch formwork and the cast-in-situ anti-collision wall formwork. The formwork is made of plastic materials, Therefore, the concrete prefabricated parts produced are much longer than the concrete prefabricated parts made of steel plates. The formwork must be operated reasonably. The detailed description of cast-in-situ steel formwork will be described in many aspects such as the size, shape and use advantages of the formwork. The thickness of the steel plate used varies with the volume of the formwork. Generally, the steel plate with a thickness of about 5mm is used to make the formwork, and the size of the formwork is not fixed, The person in charge of road construction project can make the formwork meeting his own engineering standards according to his own real engineering needs, and then use the formwork to make the cast-in-situ anti-collision wall.
現澆模板的簡單介紹會分別從模板的生產材料、使用地點這兩個方面進行介紹,來讓大家對模板進一步的進行了解,模板使用的生產材料是鋼板,鋼板的選擇可以選擇使用普通鋼板制作也可以選擇使用優質鋼板制作,鋼模板的好處在于可以進行定制,工程采購部門的人員可以根據自己的真實使用情況進行定制,定制出適合自己工程的模板,像尺寸以及使用數量還有具體的運輸地點提供給模板制作工廠的銷售人員以及制作工人就可以了,從定制模板到運輸到使用地區一般5天的時間就能完成,使用的時間很少。塑料現澆模板的優勢在于一般都有現貨,生產時間短,周轉快,用于工期短比較著急的工程,而且價格上肯定要比現澆鋼模板更便宜一些。
The brief introduction of cast-in-situ formwork will be introduced from the two aspects of formwork production materials and use location to further understand the formwork. The production material of formwork is steel plate. The choice of steel plate can be made of ordinary steel plate or high-quality steel plate. The advantage of steel formwork is that it can be customized, The personnel of the engineering procurement department can customize the template suitable for their own project according to their actual use situation, such as size, use quantity and specific transportation location. It can be provided to the sales personnel and production workers of the template manufacturing factory. It usually takes 5 days from the customized template to the transportation to the use area, and the use time is very little. The advantage of plastic cast-in-place formwork is that it is generally available in stock, with short production time and fast turnover. It is used for projects with short construction period and urgent construction period, and the price is certainly cheaper than cast-in-place steel formwork.